WSDF-North Invention Package

In each of the towns WSDF-N intervention provides a full package inclusive of but not limited to:
a) A functional piped water supply system, with
b) Protected catchment areas,
c) A water office,
d) A public water-borne toilet,
e) Households Ecosan toilets for demonstration purpose,
f) Operation and Maintenance structures,
g) Assets register,
h) As built drawings and
i) Operation manuals delivered upon completion of each town project.

 

WSDF-North Areas of Operation

West Nile Sub regions (08): Nebbish, Zombo, Aura, Maraca, Kobuk, Yomba, Moyo, Adjumani
Acholi Sub region (07): Amuru, Nwoya, Gulu, Pader, Agago, Kitgum, Lamwo
Lango Sub region (08): Oyam, Apac, Kole, Lira, Alebtong, Otuke, Dokolo, Amolatar
Project Summary

Milestone No. of towns Towns
No. of designs completed to date 13 Loro, Namasale, Bibia/Elegu,Pabbo,Zombo T.,
Acholibur,Rackoko,Agago T., Mucwini, Namokora, Paloga, Lagoro, Palabek-Ogi
On-going designs under consultancy assignments 6 Abia, Apala, Omoro, Bar-job, Olilim, Parabongo
Towns under planning up to 2018 30 Loro  Namasale, Bibia/Elegu, padibe, Pabbo, Odramacaku,  Zombo T.C,  Acholibur, Rackoko, Agago T.C, Barr, Amuru TC, Bala, Keri, Awach, Barakara, Lamwo-Lokung-Olebi TC, Aboke, Palabek-Kal, Atiak, Kole-Molem T.C, Atapara, Okpotani, Kitgum-matid, Ngai, Iceme, ArraDufile, Obongi, Okokoro, Rhino Camp
Planned No. water schemes in former IDP camps for re-sizing/ conversion 8 Palenga, Alero, Erussi, Alangi, Kati, Kubala, Lodonga, Itula
Sanitation component 112Household Ecosan Demonstration Toilets

30 VIPs

14 Water Borne: 8

Sanitation Infrastrure Under Construction = 52

Nkoni, Kyamulibwa, Najjembe, Kinogozi, Butiaba, Bugoigo, Walukuba, and Gombe

#Town/RGCNarrativeStatusPartnersContractor
1OmugoConstruction Complete
100%
Sumadhura Technologies Limited
2AgwengConstruction Complete
100%
AWICO CONSTRUCTION Ltd
3PaidhaConstruction Complete
100%
PALM CONSTRUCTION Ltd.
4OvujoCompleted
100%
M/S NORM CONTRAS LTD
5Purongo TBCompleted
100%
GETS TECHNICAL SERVICES (GTS) LTD
6AdjumaniConstruction of Adjumani town water supply and sanitation system
100%
SUMANDHURA TECHNOLOGIES LIMITED
7AmolatarOn-going
98%
M/S DASAWIHI LIMITED
8Ngetta Laying HDPE pipes at Ngetta
100%
Kheny Technical Services Ltd
9Patongo TCCompleted
100%
PALM CONSTRUCTION LTD
10IbujeCompleted
100%
Balaji Industrial and Agricultural Castings
11OpitCompleted
100%
SCABS TECHNICAL SERVICES LTD
12MoyoFeasibility studies and detailed Engineering design of water supply and sewerage system.
40%
Techno Consults Ltd
13BarrFeasibility studies and detailed Engineering design of water supply and sewerage system.
80%
Warner Consults Ltd
14DokoloOn-going
98%
M/S Kagga and Partners Consulting Engineers.
15PajuleCompleted
100%
16OkolloCompleted/Un-yeilding
100%
17MidigoCompleted
100%