Carry out feasibility study and design of water supply systems in the selected towns among others summarized as follows:-
  • Estimation of the anticipated water demand for the design horizon
  • Detailed assessment of water resources potential
  • Preparation of preliminary designs of water supply options
  • Prepare proposals for investment in minimum public sanitation facilities
  • Assessing potential environmental impacts of the proposed water supply development and proposing mitigation measures for negative impacts
Preparation of detailed narrative engineering designs, technical specifications, bills of quantities, drawings, engineering cost estimates and tender documentation

Project Timing

  • Start Date: 10-01-2013
  • Predicted End: 10-05-2014

Current Tasks

The assignment is at inception phase

Current Holds

The assignment is at inception phase

Project Overview and Overall Progress

20% 20% Advocacy meetings

Awareness Creation at District and Sub County Levels Call for Applications for detailed designs Receiving and Verifying applications

40% 40%Design and Mobilization

Procurement of consultants for Mobilization and design Mobilization, Feasibility Studies, Baseline Surveys Design Documentation and Preparation of Tender Documents

60% 60%Fulfillment of Community Obligations

Land acquisition, cash contributions

80% 80%Construction and O&M Set Up

Procurement of Contractors and Consultants Construction of WSS Facilities Fulfillment of the Sanitation Programme Selection and Training of Private Scheme Operator