Project Status For:, Bukedea Town Water Supply System

Project Description

The scope of works involves furnishing the necessary labour, materials, equipment and services for the expansion of Bukedea town water supply system and consists of the following main elements: Construction of 1 No. pump station; Supply, installation and commissioning of 1 No. Submersible pumps with discharge of 6m3/hr at head 200m including all associated accessories, powered by Umeme grid and a standby 30kVA diesel generator; supply, laying and commissioning of 6km of OD 75mm PN 16 transmission mains; supply, laying and commissioning of 22km of OD 110mm &OD 160mm uPvc and OD 32mm-OD 90mm HDPE PN 6 distribution pipe works and associated fittings; construction of a 100m3-capacity cold pressed panel steel storage tank raised on a 20m steel tower, construction of a Water Office inclusive of perimeter fencing and auxiliary site works, 2 construction of 1No. Chlorine Dosing Unit equipped with an Electrolytic Disinfection Machine and accessories and making of 150 private service connections and 3 public stand posts

Project Timing

  • Start Date: 01-10-2012
  • Predicted End: 18-04-2013

Current Tasks

Current Holds

Project Overview and Overall Progress

20% 20% Advocacy meetings

Awareness Creation at District and Sub County Levels Call for Applications for detailed designs Receiving and Verifying applications

40% 40%Design and Mobilization

Procurement of consultants for Mobilization and design Mobilization, Feasibility Studies, Baseline Surveys Design Documentation and Preparation of Tender Documents

60% 60%Fulfillment of Community Obligations

Land acquisition, cash contributions

80% 80%Construction and O&M Set Up

Procurement of Contractors and Consultants Construction of WSS Facilities Fulfillment of the Sanitation Programme Selection and Training of Private Scheme Operator