Project Status For:, Agweng

Project Description

agweng-plant
Project Name Agweng RGC water supply and sanitation system
Contract # LIRA531/WRKS/11-12/00107
Scope of contract 02 boreholes with submersible pumps (5m3/h and 2.5m3/h). 16.5KVA diesel generator and 14No. Solar panels, 2,570m transmission line. 01No 100-m3 reservoir tank. 18 km of OD 110/75/63 mm HDPE distribution network. 130 service connections. 02 water kiosks. 1No. 04-stances Ecosan toilette at primary school. 7No. household Ecosan toilets. 01 public flush toilet. 01 office block.
Revised Contract Price UGX 1,100,645,441
Contractor AWICO CONSTRUCTION Ltd
Date of commencement 2nd April 2013
Planned date for completion 30th May 2014
Actual Progress (%) 100%
Remarks The piped water supply system and sanitation project is due for technical commissioning. However it has been handed over to the Water Authority and subsequently to the scheme operator to operate and manage on behalf of the Authority, but official hand over is being arranged for the defects liability period to start.

Project Timing

  • Start Date: 04-02-2013
  • Predicted End: 05-30-2014

Current Tasks

Current Holds

The piped water supply system and sanitation project is due for technical commissioning. However it has been handed over to the Water Authority and subsequently to the scheme operator to operate and manage on behalf of the Authority, but official hand over is being arranged for the defects liability period to start.

Project Overview and Overall Progress

20% 20% Advocacy meetings

Awareness Creation at District and Sub County Levels Call for Applications for detailed designs Receiving and Verifying applications

40% 40%Design and Mobilization

Procurement of consultants for Mobilization and design Mobilization, Feasibility Studies, Baseline Surveys Design Documentation and Preparation of Tender Documents

60% 60%Fulfillment of Community Obligations

Land acquisition, cash contributions

80% 80%Construction and O&M Set Up

Procurement of Contractors and Consultants Construction of WSS Facilities Fulfillment of the Sanitation Programme Selection and Training of Private Scheme Operator