Project Status For:, Namutumba Town Council/Kamod Town Board

Project Description

The scope of works involves furnishing the necessary labour, materials, equipment and services for the expansion of Namutumba town water supply system and restoration of Kamod town water supply system, and consists of the following main elements:   Expansion of Namutumba town water supply system: Construction of 1 No. pump station; Supply, installation and commissioning of 1 No. Submersible pumps with discharge of 16m3/hr at head 170m including all associated accessories, powered by Umeme power grid and a standby 44kVA diesel generator; supply, laying and commissioning of 4.1km of OD 90mm HDPE PN 16 transmission mains; supply, laying and commissioning of 5.1km of OD 110mm &OD 160mm uPvc and 7.7KM OF OD 50mm-OD 90mm HDPE PN 6 distribution pipe works and associated fittings and ancillaries; construction and furnishing of a Water Office inclusive of perimeter fencing, and auxiliary site works; construction of a public waterborne toilet and its ancillary works; extension of 3-phase power to the new pump station over a distance of 2.5km inclusive of 1 No.substation and all works and supplies necessary to make the power connection complete and functional; construction of 1No. Chlorine Dosing Unit equipped with an Electrolytic Disinfection Machine, dosing equipment and accessories and making of 130 private service connections; construction of an ecosan toilet at the pump station Restoration of Kamod town water supply system: Supply of 1.2km of OD 110mm uPVC PN 10 transmission pipes; excavation and repair/replacement of transmission pipes in identified defective sections over a distance of 4.3km inclusive of all ancillary works

Project Timing

  • Start Date: 12-06-2014
  • Predicted End: 11-06-2015

Current Tasks

Contract implementation on schedule

Current Holds

Defects Liability Period: From 12th June 2015 to 11th June 2016

Project Overview and Overall Progress

20% 20% Advocacy meetings

Awareness Creation at District and Sub County Levels Call for Applications for detailed designs Receiving and Verifying applications

40% 40%Design and Mobilization

Procurement of consultants for Mobilization and design Mobilization, Feasibility Studies, Baseline Surveys Design Documentation and Preparation of Tender Documents

60% 60%Fulfillment of Community Obligations

Land acquisition, cash contributions

80% 80%Construction and O&M Set Up

Procurement of Contractors and Consultants Construction of WSS Facilities Fulfillment of the Sanitation Programme Selection and Training of Private Scheme Operator