Project Status For:, Ochero/Kaaga and Matany

Project Description

The scope of works involves furnishing the necessary labour, materials, equipment and services for the construction of Ochero town water supply system and renewal of matany town water supply system, and consists of the following main elements:
  • Construction of Ochero town water supply system involving;
Construction of 1 No. pump station; Supply, installation and commissioning of 1 No. Submersible pump with a discharge of 14m3/hr at a head of 160m, including all associated accessories and control devices, powered by UEDCL grid and a standby 30kVA diesel generator, construction of a pump station, supply, laying and commissioning of 2km of OD 90mm HDPE PN 16 transmission mains; supply, laying and commissioning of 9.9km of OD 40mm-OD 90mm HDPE PN 10 and PN 6 distribution pipe lines inclusive of all associated fittings and ancillaries; construction of a 50m3-capacity cold pressed panel steel storage tank raised on a 1.2m dwarf wall, construction of a Water Office fully equipped with basic furniture and IT equipment and a chain link perimeter fence and auxiliary site works; construction of 1 No. Chlorine Dosing Unit equipped with an Electrolytic Disinfection Machine complete with a doser, construction of a public waterborne toilet , extension of 3-phase UMEME/UEDCL to the pump station over a distance of 1.8km and making of 150 private service connections and 3 public stand posts
  • Renewal of Matany town water supply system involving;
supply, laying and commissioning of 6.4km OD 32mm- OD 90mm HDPE PN 6 distribution pipe lines and associated fittings and ancillaries, construction of 1 No. Chlorine dosing house equipped with an Electrolytic Disinfection Machine complete with a doser and extension of 3-phase power line to the pump station over a distance of 1km

Project Timing

  • Start Date: 14-02-2014
  • Predicted End: 30-11-2013

Current Tasks

Contract implementation on schedule

Current Holds

Defects Liability Period: From 17th February 2015 to 16th February 2016

Project Overview and Overall Progress

20% 20% Advocacy meetings

Awareness Creation at District and Sub County Levels Call for Applications for detailed designs Receiving and Verifying applications

40% 40%Design and Mobilization

Procurement of consultants for Mobilization and design Mobilization, Feasibility Studies, Baseline Surveys Design Documentation and Preparation of Tender Documents

60% 60%Fulfillment of Community Obligations

Land acquisition, cash contributions

80% 80%Construction and O&M Set Up

Procurement of Contractors and Consultants Construction of WSS Facilities Fulfillment of the Sanitation Programme Selection and Training of Private Scheme Operator